Project Information
AdditionsForms
Handouts
Comments
Site plan required (see example in forms)
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier (1- or 2-family dwellings)
Building Contractor (Commercial/industrial)
Owner residing in the home
Forms
Handouts
Finishing your basement brochure
Comments
Finished basements require sketch of proposed work or layout.
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier (1- or 2-family dwellings)
Building Contractor (Commercial/industrial)
Owner residing in the home
Handouts
Comments
Building identification is required by Village ordinance 13.48
Forms
Handouts
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Building Contractor
Building Owner
Forms
Handouts
2016 New Deck Requirements
Decks Brochure
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier
Owner residing in the home
Forms
Handouts
Comments
Utility disconnects must be submitted at the time of application submittal.
Who Can Pull the Permit?
Contractor
Owner residing in the home
Forms
Building/Zoning
Wisconsin BP Application
Drainage Stormwater Permit
State Erosion Control Application Form
2015 Act 211
Handouts
New 1- or 2-Family Dwelling Handout
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier
Owner intending to reside in home for 12 months after occupancy
Forms
Comments
Residential Electrical inspected by Village of Fox Crossing inspectors. Commercial Electrical inspected by Birschbach Inspection Service, LLC.
Who Can Pull the Permit?
Master Electrician
Owner residing in the home
Forms
Handouts
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier
Owner residing in the home
Forms
Handouts
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Contractor
Owner residing in the home
Forms
Handouts
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier
Owner residing in the home
Forms
Handouts
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Building Contractor
Owner
Forms
Building/Zoning
Wisconsin BP Application
Handouts
Applying for a New Manufactured Home Brochure
Comments
Site plan required (see example in forms). Wisconsin BP Application required for homes produced on or after April 1, 2007.
Who Can Pull the Permit?
Manufactured Home Installer
Owner residing in the home
Forms
Moving Application
Utility Disconnect Form
Who Can Pull the Permit?
Contractor
Owner residing in the home
Forms
Handouts
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Building Contractor
Owner
Forms
Comments
Permits are required for roofing work in the Village.
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier (1- or 2-family dwellings)
Owner residing in the home
Forms
Handouts
Comments
Site plan required (see example in forms).
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier
Owner residing in the home
Forms
Comments
Permits are required for siding work in the Village.
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier (1- or 2-family dwellings)
Owner residing in the home
Forms
Comments
All new signs require permits.
Sign permit for wall-mounted signs,Building/Zoning for free-standing (site plan required).
Sign renditions required for wall and freestanding signs.
Freestanding signs require building/zoning permit (site plan required).
No permit necessary for direct replacement of face plates.
Who Can Pull the Permit?
Contractor Owner
Handouts
Handouts
Forms
Electrical Application-Permanent Pools Only
Handouts
Comments
Site plan required – Permanent Pools Only
Temporary – Includes the blue inflatable pools and similar. These pools need to be disassembled for over the winter. Generally, by end of October pools left up over winter months will be considered permanent and must abide by rules of.
Who Can Pull the Permit?
Contractor (Master Electrician for electrical permit)
Owner residing in the home
Forms
Handouts
Basement Bedroom/Egress Window Brochure
Who Can Pull the Permit?
Dwelling Contractor with Dwelling Contractor Qualifier
Owner residing in the home
Forms
Comments
If reducing or enlarging existing windows, or if adding new windows, see Alterations/Remodeling above. If simply replacing windows, no alteration of window opening size or alteration of walls, no permit required.